Source - Alliance News

Panthera Resources PLC - Africa and India-focused gold miner - Completes drilling at Bassala project in Mali. It says it has completed 2,601 metres of reverse circulation drilling in 23 drill holes, and 3,030 metres of air-core drilling in 50 drill holes. The company says samples have been submitted to the SGS laboratory in Bamako with results expected later this month.

Managing Director Mark Bolton says: ‘The project has been accelerated from a grassroots prospect through a gold in soil and geophysics survey. The Basala project has a large number of mineralised targets with three areas prioritised for follow-up AC/RC drilling in this programme. Logging of drill cuttings has observed strong quartz veining and alteration - sulphide or limonite after sulphide, chlorite and silica. We look forward to the assay results expected later in the quarter.’

The Bassala project is located within the Birimian volcano-sedimentary belt in southwestern Mali, about 200 kilometres south of the capital city Bamako.

Current stock price: 6.00 pence, up 4.3% on Friday

12-month change: down 66%

Copyright 2022 Alliance News Limited. All Rights Reserved.

Find out how to deal online from £1.50 in a SIPP, ISA or Dealing account. AJ Bell logo

Related Charts

Panthera Resources PLC (PAT)

0p (0.00%)
delayed 06:38AM